...
- At least 1 GHz of total bandwidth and no individual basebands < 1 GHz in S-band or above, or < 500 MHz in L-band.
- If total bandwidth =< 2GHz and C-band or above, check the proposal abstract to see if the primary aim is continuum or spectral line (feel free to double-check with a Stage 2 Reviewer if unsure). This effectively makes means checking the abstract for each project that uses 3C286 or 3C147 as the flux cal.
...