Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

  1. At least 1 GHz of total bandwidth and no individual basebands < 1 GHz in S-band or above, or < 500 MHz in L-band.
  2. If total bandwidth =< 2GHz (i.e. purely 8-bit) and C-band or above, check the proposal abstract to see if the primary aim is continuum or spectral line (feel free to double-check with a Stage 2 Reviewer if unsure). This effectively makes checking the abstract for each project. 

Action items

  •