...
- At least 1 GHz of total bandwidth and no individual spectral windows basebands < 1 GHz in S-band or above, or < 500 MHz in L-band.
- If total bandwidth =< 2GHz (i.e. purely 8-bit) and C-band or above, check the proposal abstract to see if the primary aim is continuum or spectral line (feel free to double-check with a Stage 2 Reviewer if unsure).
...