Define ATM in context of execution periodApply pre-committed time per facilityApply maintenance time per facilityApply carry-over per facilityInspect ATMManual modification of ATMSource Conflict identification in ODsInspection of ODsModification of ODsAssign Preliminary SPGenerate reports: Facility Report, Proposal Summary Inspect Facility Report, Proposal SummaryInspect ADsApprove ADsGenerate Directors' Reports
A1
A2A3













Expand
titleA1
As a scheduler I would like to define an available time model (ATM) for my facility so I know how much time is available for new Allocation Requests (ARs) to fill.

When the ATM is first defined for my facility I want it to use the execution period set in the Solicitation.

As a scheduler I want to be able to modify the execution period the ATM uses for my facility so I can support my facility specific scheduling requirements.
As a scheduler I want to be able to make late modifications to the execution period my facility references so I do not have to delete all of my work.
As a VLA scheduler I want
to define different
the configuration defined in the Solicitation to each have an execution period in the VLA ATM.

As a VLA scheduler I want to modify the execution periods per configuration so the available time per configuration is accounted for correctly in the VLA ATM.

As a scheduler I want algorithms to build the ATM for my facility using facility specific constraints so I can add projects and precommitted time to it.
Expand
titleA2
As a scheduler I want to define pre-committed time for my facility's ATM.
As a scheduler I want to import the details of past proposals so it will populate the ATM.

As a scheduler I want to manually add pre-committed time to the ATM so it is accounted for.

As a s scheduler I want to easily discern the different types of blocked off time in the ATM so I know how the time is being accounted for.



Expand
titleA3
As a scheduler I want to define maintenance periods for the facility such that the ATM will not schedule ARs in those blocks of time.
As a scheduler I want to be able to upload a file with LST/GST, duration, date, and name/description that defines the maintenance periods.

As a scheduler I want to be able to manually add maintenance periods.

As a scheduler I want to be able to edit or delete existing maintenance periods.