Storyboard for PPR Proposal Process
Define ATM in context of execution period | Apply pre-committed time per facility | Apply maintenance time per facility | Apply carry-over per facility | Inspect ATM | Manual modification of ATM | Source Conflict identification in ODs | Inspection of ODs | Modification of ODs | Assign Preliminary SP | Generate reports: Facility Report, Proposal Summary | Inspect Facility Report, Proposal Summary | Inspect ADs | Approve ADs | Generate Directors' Reports |
---|
A1 | A2 | A3 |
|
|
|
|
|
|
|
|
|
|
|
|
...
|
As a scheduler I would like to define an available time model (ATM) for my facility so I know how much time is available for new Allocation Requests (ARs) to fill. |
---|
When the ATM is first defined for my facility I want it to use the execution period set in the Solicitation. | As a scheduler I want to be able to modify the execution period the ATM uses for my facility so I can support my facility specific scheduling requirements. | As a scheduler I want to be able to make late modifications to the execution period my facility references so I do not have to delete all of my work. | As a VLA scheduler I want to define different execution periods per configuration so the available time per configuration is accounted for in the ATM. |
|
file upload | file upload | file upload/ import | algorithm | manual | manual | manual | manual | A1 | would like to define an available time model (ATM) for my facility so I know how much time is available for new Allocation Requests (ARs) to fill.When the ATM is first defined for my facility I want it to use the execution period set in the Solicitation. | As a scheduler I want to be able to modify the execution period the ATM uses for my facility so I can support my facility specific scheduling requirements. | As a scheduler I want to be able to make late modifications to the execution period my facility references so I do not have to delete all of my work. | As a VLA scheduler I want to define different execution periods per configuration so the available time per configuration is accounted for in the ATMwant to define maintenance periods for the facility such that the ATM will not schedule ARs in those blocks of time. |
---|
|
|