...
Define ATM in context of execution period | Apply pre-committed time per facility | Apply maintenance time per facility | Apply carry-over per facility | Inspect ATM | Manual modification of ATM | Source Conflict identification in ODs | Inspection of ODs | Modification of ODs | Assign Preliminary SP | Generate reports: Facility Report, Proposal Summary | Inspect Facility Report, Proposal Summary | Inspect ADs | Approve ADs | Generate Directors' Reports | ||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| file upload | file upload | file upload/ import | algorithm | ||||||||||||||||
manual | manual | manual | manual | |||||||||||||||||
A1 | As a scheduler I would like to define an available time model (ATM) for my facility so I know how much time is available for new Allocation Requests (ARs) to fill. |
---|---|
When the ATM is first defined for my facility I want it to use the execution period set in the Solicitation. | |
As a scheduler I want to be able to modify the execution period the ATM uses for my facility so I can support my facility specific scheduling requirements. | |
As a scheduler I want to be able to make late modifications to the execution period my facility references so I do not have to delete all of my work. | |
As a VLA scheduler I want to define different execution periods per configuration so the available time per configuration is accounted for in the ATM. |