Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.
  • Create a task list (e.g., documents that need to be generated).
  • Unified TAC experience (Socorro vs Green Bank)


Introduction

The NRAO/GBO Telescope Time Allocation Committee (TAC) makes recommendations to the Directors about scheduling priorities, approved time, proprietary period, and disposition constraints.   These are all included in the Observation Specification Disposition.  The TAC does not re-evaluate the scientific or technical merit of the proposal.  Thus, they do not change the consensus comments or linear-rank.  They can, however, point out errors in the consensus comments that lead to changes in the text if approved by the SRP chair.


Documents

Here we list the relevant documents that