Date:

Time: 10:30 ET (8:30 MT)

ER209





Agenda

  • News

  • Program Administration 
  • Science Ready Data Products
    • Testing of cal+img underway
    • Pipeline test version by 19th
    • QA-related pipeline requests in the "no flagging" era
      • Large image/cube mitigation.  PIPE-2452 - Getting issue details... STATUS
  • VLASS
    • Planning for VLASS-II
      • Now have Texas TACC account set up
      • Met with DMS, discussed options, priorities:
        • Validate pipeline for 1" cubes wit tapering (SECC)
        • Validate and profile hpgawp (GPU) pipeline locally (L4s)
          • Rui has ticket to put into pipeline
        • Get awphpg running on different GPUs
        • VLASS manager changes/data origin setup.
          • K Scott has "read only" version running, need to get products back.
      • 30 GPUs arrived, asked K Scott to install 3-4 for testing.
      • ML to request 1 year increase to projects space for VLASS-II dev.
    • Ep3  QL catalog - ask Dillon
    • New Ep1+2 catalog for SECI masks - ML to email location to Juergen
    • Calibrator uv ranges
  • AOB

Overdue Action Items:

Key Summary Due Assignee original due date
Loading...
Refresh

Upcoming Action Items:

Key Summary Due Assignee original due date
Loading...
Refresh